China Manufactory Construction Scaffolding Shoring Scaffold Steel Adjustable Prop
Basic Info.
Model NO. | scaffolding prop |
Application | Hotel, Apartment, Office Building, Formworks |
After-Sale Service | Online Technical Support, Onsite Installation, Fre |
Model | Light-Duty,Heavy-Duty |
Delivery Time | 25-30 Days |
MOQ | 1 Container |
Usage | Formwork |
Color | Customer′s Request |
Inner Tube | 48/40mm |
Tube Thickness | 1.6-4.0mm |
Outer Tube | 60/56/48mm |
Surface Treatment | Hot Dipped Galvanized, Pre Galvanized, Painted, Po |
Keyword | Steel Prop |
Transport Package | Packing in Bundle |
Specification | 48.3mm |
Trademark | TFCO |
Origin | Tianjin, China |
HS Code | 73084000 |
Production Capacity | 50 Twenty-Foot Container Per Month |
Product Description
Product Description
SPECIFICATIONS FOR ADJUSTABLE STEEL PROP | |||
Description | Adjustable Steel Props for Scaffolding formwork | ||
Tube size | 48/60mm, 40/48mm, 48/56mm | ||
Tube Thickness | 1.6-4.0mm | ||
Adjustable Length | 2400-3900mm, 2000-3500mm, 3000-5500mm or as per your drawing | ||
Surface treatment | Hot dipped Galvanized, Pre galvanized, Painted, Powder coater | ||
Type | Heavy Duty, Light Duty | ||
MOQ | One container | ||
Delivery time | within 20 days | ||
Application | scaffolding and formwork |
Detailed Images
Base Plate
The popular types for base plate and top plate are flower plate and square plate. Common sizes are 120*120mm, 150*150mm, 140*140mm with thickness 3-8mm.
Screw Part
There are two kinds of threading part. One has welding joint and the other one without welding joint, which is screwing directly on the outerside tube.Nut Coupler
Wing nut coupler is frequently used in heavy duty steel props, while the cup nut is common in light duty steel props. Usually the cup nut steel props has the tube size 48/56mm.Smooth welding lines
We have 5 auto welding lines in production, all props are welded with solid and smooth welding lines. During the in-line production process, our QC will detectthe lack of welding.
Packaging & Shipping
Our Advantages
1) We have our own steel pipe production lines, which provide raw material for steel props. Thus can control the quality and delivery time better.
2) Professional welding engineers with more than 10 years welding experience for high quality welding
3) QC team to do the inspection for sizes, thickness, welding part and surface during in-line production and final packing
4) 15 years experience in Steel Pipe and Scaffolding field, and rcih cooperation experience with heavy buyers
5) Fast delivery
Company Profile
Our Team
FAQ
1. Q: What's your MOQ(minimum order quantity)?A: One full 20ft container,mixed acceptable .2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted).3. Q: What's your delivery time?
A: 10-20 days after received the advance payment .4. Q: Are you manufacturer or trader?
A: We are a professional steel product manufacturer with more than 15 years of export experience.5. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing), close to Tianjin Port6. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.7. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials.